The rebuilt walk-in shower, finished: bench, grab bar, hex floor, and a niche. This is the room the membrane work buys.

Shower Remodeling · St. George, Utah

A shower is dry because the waterproofing is a system

Shower remodeling in St. George, Utah, rebuilt from the membrane out.

Licensed and insuredWe guarantee our workWritten estimate before work starts
§01

Intro

St. George Bath & Kitchen does shower remodeling in St. George, Utah, and a shower is the wettest square footage in the house. The shower tile is the last thing that goes on a shower and the first thing a homeowner sees, but the shower is dry because of the work behind the tile: the membrane, the floor, and the drain, built as one system, which is what shower waterproofing actually is. A shower job that changes the tile and leaves the waterproofing alone is a refresh of a shower that is already failing. This page prices a walk-in shower as a full scope, tells you when a curbless shower is the right version of it, and tells you how to tell whether yours needs one, or whether the honest scope is the bathroom remodeling around it.

Shower scope chooser

Refresh or rebuild. The membrane decides, and the chooser shows both.

Shower scope chooser

§02

From the membrane out

A shower is built in layers, and the order matters. The membrane goes in first, behind the tile, and it is what keeps the water in the shower and out of the wall. Then the floor, graded to the drain in one plane, so water runs where it is supposed to run and does not pool at the corner. Then the drain itself, a linear drain along the edge of the floor where a curbless shower needs it, or a center drain where the room asks for one. The tile goes on last, and the bench and the niche are planned before the tile goes on, because a bench only works when the shower is wide enough for it, and a niche only works when it is planned with the shower width.

Grout sealer is not waterproofing. A coat of sealer on a failed membrane is a coat of paint on a leaking roof. When we price a full rebuild, the waterproofing is its own line in the written estimate, so you can see what the system costs and what the tile costs.

Backer and waterproofing up, the first marble tiles set, the niche framed. The system goes on in layers, and each layer is checked before the next.

Backer and waterproofing up, the first marble tiles set, the niche framed. The system goes on in layers, and each layer is checked before the next.

Hands setting the drain pipe in the floor opening. The drain’s position and height decide the floor’s slope, so it is set before anything around it.

Hands setting the drain pipe in the floor opening. The drain’s position and height decide the floor’s slope, so it is set before anything around it.

The valve body set in the tiled wall. The valve goes in at the rough stage and is sealed at every penetration.

The valve body set in the tiled wall. The valve goes in at the rough stage and is sealed at every penetration.

The written estimate is the number that governs

Ranges plan the job. The written estimate prices your room, itemized, before anything is ordered or demolished.

Call 435-412-4316
§03

What you notice, and what it means

You notice the grout is dark at the shower floor, and the tile feels hollow in one corner. That usually means water has got behind the tile, and the membrane underneath has failed. A refresh will not answer it. The shower has to come back to the studs, and the waterproofing has to be rebuilt as a system.

You notice the shower floor pools water at the drain, or the drain is slow even when it is clean. That usually means the floor was not graded to the drain, and the fix is a floor, not a fixture. You notice the shower is too small to turn around in, or the bench is missing where you need one. That usually means the shower was built for a different household, and the fix is a walk-in shower planned with the bench and the niche from the first measurement.

Look at what you can see, name what it means, and price the scope that answers it.

§04

The scope, priced

A shower rebuild is priced inside a full bathroom rebuild at $18,000 to $32,000, or inside a universal design bathroom at $32,000 to $48,000, when the shower is rebuilt as a walk-in with a bench and a linear drain. A shower-only job, where the rest of the bathroom is sound, is priced in the written estimate as its own scope, from the membrane, the floor, and the drain, with the tile, the bench, and the niche as their own lines, so you can see what the system costs and what the finishes cost.

Those are our typical ranges. Your written estimate prices your actual shower, and it is the number that governs.

§05

The Commerce Street wet end, before and after

The Commerce Street job, told in full on the bathroom remodeling page, is the clearest case of this. The pair below is that bathroom's wet end, before and after. The before frame shows a corner soaking tub and a framed fibreglass shower stall that looked sound. The after frame shows the wet end rebuilt: a freestanding tub, and a glass shower tiled over waterproofing rebuilt as a system. Look at the membrane first, then the tile. That is the order the work was done in, and it is the order that keeps a shower dry.

The same wet end rebuilt: a freestanding tub under the same window, a frameless glass shower with a hex-mosaic floor and a mosaic accent column, large-format grey tile throughout.
Olive walls, a corner soaking tub with a square-tile surround under a wide blinded window, a framed fibreglass shower stall beside it, towels and toiletries where the household left them; nothing in the room looks broken.
BeforeAfter
BeforeOlive walls, a corner soaking tub with a square-tile surround under a wide blinded window, a framed fibreglass shower stall beside it, towels and toiletries where the household left them; nothing in the room looks broken.
AfterThe same wet end rebuilt: a freestanding tub under the same window, a frameless glass shower with a hex-mosaic floor and a mosaic accent column, large-format grey tile throughout.
§06

What moves the price

Whether the waterproofing has to be rebuilt moves it most. Whether the floor has to be regraded to a linear drain moves it next. Whether the shower is a walk-in, whether a bench is built in, and whether the tile layout needs cutting around a niche move it after that. A bench only works when the shower is wide enough for it, and a niche only works when it is planned before the tile goes on.

The hex floor graded to the centre drain, the bench base beside it. A shower floor is a slope before it is a surface.

The hex floor graded to the centre drain, the bench base beside it. A shower floor is a slope before it is a surface.

The hex niche against the marble-look field, a grab bar below it. The niche is storage inside the wet wall, framed before tile.

The hex niche against the marble-look field, a grab bar below it. The niche is storage inside the wet wall, framed before tile.

The rain head over the tile field. Fixture choice is the last decision in a shower, and the one felt first.

The rain head over the tile field. Fixture choice is the last decision in a shower, and the one felt first.

The finished shower from the doorway: the view the whole scope was bought for.
The finished shower from the doorway: the view the whole scope was bought for.
§07

Questions

Tile going on, the niche taped at its edges. The bench and the niche are planned before tile, never cut in after.
Tile going on, the niche taped at its edges. The bench and the niche are planned before tile, never cut in after.

A shower rebuild is priced inside a full bathroom rebuild at $18,000 to $32,000, or inside a universal design bathroom at $32,000 to $48,000. A shower-only job is priced in the written estimate as its own scope.

A refresh changes the surfaces. A rebuild takes the shower back to the studs and rebuilds the waterproofing as a system behind the tile.

If the grout is dark at the shower floor, if the tile feels hollow, or if the surround has been re-caulked more times than anyone can count, water has got behind the tile.

A drain that runs along the edge of the shower floor, so the floor can be graded to it in one plane. It is what makes a curbless shower work.

A bench is part of a walk-in or universal design shower, built in and tiled like the shower. It is planned with the shower width, not added after.

A niche is planned before the tile goes on, where the bench and the shower width allow it.

A shower rebuild takes that shower out of use. We plan the sequence around a second bathroom, and your written estimate states it.

Yes. St. George Bath & Kitchen is licensed and insured, and the work is guaranteed.

Yes. We guarantee our work, and the final walkthrough does not close until the punch list does.

Call 435-412-4316 or send the form. Tanner Beck, our Operations Manager, sets the visit and measures the shower.

What is and is not working in the shower, whether the tile, the floor, or the drain is the problem, and whether you want a walk-in shower.

Yes, where the rest of the bathroom is sound. The shower is priced in the written estimate as its own scope.

Priced in writing, before work starts

Send the form or call the shop. Tanner comes out, measures the room, and prices your actual scope in writing.

Start with the form