A primary bath with a dark vanity and a glass shower: basin and faucet at the vanity, the shower finished behind glass.

Bathroom Remodel Cost Guide · St. George, Utah

What a bathroom costs here, and what the water has to do with it

Bathroom cost in St. George, Utah, priced in writing before work starts.

Licensed and insuredWe guarantee our workWritten estimate before work startsSt. George, Utah
§01

Intro

St. George Bath & Kitchen prices bathroom remodeling in St. George, Utah, and a bathroom price is never just a tile price. It is a waterproofing price, a plumbing price, and a bathroom vanity price, and the scope is what prices the job. The bathroom page tells the Bloomington Hills job in full. This page prices the four bathroom ranges side by side, in our own ranges: a bathroom refresh, a full bathroom rebuild, a universal design bathroom, and a bathroom addition. It tells you what moves each one, so you can read a quote and know whether the water has been priced in.

Bathroom cost estimator

The four canonical bathroom ranges, exactly as this guide publishes them.

The ranges are for planning. Your written estimate prices your actual room, and it is the number that governs.

§02

The four ranges, side by side

Refresh, $8,000 to $15,000: the layout stays, the sound boxes stay, the surfaces change. That fits a bathroom whose waterproofing holds and whose surfaces are the whole complaint.

Full rebuild, $18,000 to $32,000: back to the studs, plumbing moved where it has to move, waterproofing rebuilt as a system. That fits a shower that leaks, a surround that has failed, or a tub shower that has served the household daily to the end of its life.

Universal design, $32,000 to $48,000: curbless shower, bench, grab bars, and comfort height toilet, planned as one scope. It is priced in full on the age-in-place page.

Addition, $50,000 to $70,000: a new room first and a bathroom second, and the foundation is what makes the bathroom possible. It is priced in full on the bathroom additions page.

Those are our ranges, and no other business's prices are quoted on this page. Your written estimate, for your bathroom, is the number that governs.

A refresh: a solid-surface shower room with a bench and a handheld, surfaces renewed over sound work.

Refresh

A refresh: a solid-surface shower room with a bench and a handheld, surfaces renewed over sound work.

A full rebuild: a soaking tub standing free and a shower behind glass, the room taken back and rebuilt as one system.

Full rebuild

A full rebuild: a soaking tub standing free and a shower behind glass, the room taken back and rebuilt as one system.

The universal range, shown by its subject: a shower entered without a curb, its bench built in, bars on two walls, and the handheld riding a vertical bar.

Universal

The universal range, shown by its subject: a shower entered without a curb, its bench built in, bars on two walls, and the handheld riding a vertical bar.

The primary bath an addition carries: a whole new room’s bathroom, priced on the addition range.

Addition

The primary bath an addition carries: a whole new room’s bathroom, priced on the addition range.

The written estimate is the number that governs

Ranges plan the job. The written estimate prices your room, itemized, before anything is ordered or demolished.

Call 435-412-4316
§03

One bathroom, two ways

Take one bathroom, a hall bath whose tile still looks fine, and price it two ways. As a refresh, at $8,000 to $15,000, the surfaces change and the waterproofing is trusted, because nothing has shown it failing. If the visit finds the membrane gone behind that tile, the same bathroom is a full rebuild at $18,000 to $32,000, because the shower comes back to the studs and the waterproofing is rebuilt as a system before any tile goes back on. The two prices are not two opinions about the same job. They are two different jobs, and the difference is behind the tile, which is why the visit looks there before the number is written.

§04

What moves each range

Whether the waterproofing has to be rebuilt moves a refresh into a full rebuild, because a failed membrane cannot be refreshed. Whether the plumbing moves moves a full rebuild, because a shower that changes place changes the drain, the vent, and the floor. Whether the shower is a walk-in, and whether the vanity is single or double, moves the price inside each range, because glass, tile, and cabinetry are priced as their own lines. Whether the job is a universal design bathroom moves it again, because the floor, the drain, and the door are planned as one scope. An addition moves it most of all, because a new room needs a foundation before it needs a tile.

A bathroom gutted to framing, seen from above: new framing, insulation, and the drain in the slab. A layout change is priced from this state, not from the finished room.

A bathroom gutted to framing, seen from above: new framing, insulation, and the drain in the slab. A layout change is priced from this state, not from the finished room.

A shower valve roughed in with copper in an open wall. The valve’s position is set now, before the wall closes, and it decides where the controls land for years.

A shower valve roughed in with copper in an open wall. The valve’s position is set now, before the wall closes, and it decides where the controls land for years.

Subway tile being set in a bathroom, thinset going on. Bathroom tile is priced by area, pattern, and the waterproofing under it.

Subway tile being set in a bathroom, thinset going on. Bathroom tile is priced by area, pattern, and the waterproofing under it.

The finished shower’s rain head, digital controls, and handheld, close up. Fixture grade is the driver you touch every day.

The finished shower’s rain head, digital controls, and handheld, close up. Fixture grade is the driver you touch every day.

§05

How to read a quote

A quote that gives you one number for a whole bathroom is not a quote you can read. A quote you can read gives you the waterproofing, the plumbing, the vanity, the shower, and the tile as their own lines, so you can see what the system costs and what the finishes cost. That is how our written estimate is written, itemized, priced in writing before work starts. If a quote does not break the job down that way, ask for the breakdown before you sign it, and ask whether the waterproofing is priced as a system or as a coat of sealer.

A finished primary bath, quiet and complete: the room the four ranges are all describing, at four depths.
A finished primary bath, quiet and complete: the room the four ranges are all describing, at four depths.
§06

Questions

$8,000 to $15,000, for a bathroom whose layout works and whose waterproofing holds.

$18,000 to $32,000, taking the room back to the studs and rebuilding the waterproofing as a system.

$32,000 to $48,000, planned for aging in place as one scope, priced in full on the age-in-place page.

$50,000 to $70,000, priced as its own scope on the bathroom additions page.

Whether the waterproofing has to be rebuilt, and whether the plumbing moves.

In our experience it is the membrane underneath, not the tile on top. The shower has to come back to the studs, and the waterproofing has to be rebuilt as a system, for the leak to stop.

Inside the full rebuild range, $18,000 to $32,000, or inside the universal design range, $32,000 to $48,000, depending on whether the floor, the drain, and the door are planned as one scope.

Inside a full rebuild or a universal design bathroom, as a component of that scope, not as a price on its own.

Because there is no standalone published figure for a shower on its own. A shower-only job, where the rest of the bathroom is sound, is priced in the written estimate as its own scope, inside the bathroom ranges, with the waterproofing, the plumbing, the vanity, and the tile as their own lines.

Because the range is a scope, not a size. A full rebuild with a plumbing move costs more than a full rebuild without one, and the written estimate shows that as its own line.

A design fee is not, because there is no design fee. Design is priced inside the kitchen and bathroom scopes, in the written estimate.

The waterproofing, the plumbing, the vanity, the shower, and the tile as their own lines, priced in writing before work starts, with changes priced the same way before changed work happens.

Priced in writing, before work starts

Send the form or call the shop. Tanner comes out, measures the room, and prices your actual scope in writing.

Start with the form